|
Staging the equipment prior to an installation is a very critical step in the process of providing our customers with successful
implementations. Expensive on-site field service time is not used up while a Customer Support Professional (CSP) configures and tests the equipment purchased from the Technology Solutions
Group (TSG) of Digital Controls. The equipment has been staged and is ready to go!
Prior to delivery to the customer, all equipment is shipped to TSG for staging and burn
in. The equipment is configured to the customerâs specifications and tested prior to being sent to the customer site for installation. Documentation is prepared and
checked and sent with the equipment for use by the customer and the installation team. Routers are configured and tested, servers are assembled, operating systems
are loaded with the appropriate device drivers, and disks are formatted, sliced and/or striped per the customerâs requirements. Finally, all devices are tested to ensure
compatibility with each other. Whatever needs to be done to ensure that the equipment being shipped to the customer works, and works together with other equipment being
shipped is how the Technology Solutions Group of Digital Controls defines staging.
Staging checklists are used to ensure that all of the equipment being sent to a
customer has been set up and tested prior to its being shipped. Staging checklists vary by equipment type but the following is an example of the staging done by TSG on Sun Microsystems or Compaq servers:
- Assemble all ordered hardware kits and options
- Ensure compatibility of ROM BIOS levels
- Verify interrupt levels to ensure hardware component functionality
- Attach and test all ordered external SCSI devices
- Install current version of ordered O/S
- Format and partition all disks per customerâs requirements
- Load O/S packages
- Check that all manufacturerâs documentation is present
- Load on-line library application (if applicable)
- Load all software utilities to vendor default selections
- Test access to all system components via O/S interface
- Minimum of 24 hours of additional burn-in
- Tune O/S to customer specification
- Set up system users (6 for UNIX, 2 for NT)
- Create boot diskette (if applicable)
- Backup system with basic configuration (if backup device is present in system)
- Document all files and structures
- Document procedures for startup and shutdown
- Prepare customer documentation
The following checklist is used when staging is performed on routers by TSG. Prior to
the staging, a work order is reviewed by the Customer Support Professional detailing how the router is to be installed and on what type of connection. The information on the
work order determines which part(s) of the network equipment staging checklist to use.
- Configure Ethernet port
- IP address
- IP address helper
- Full or half duplex
- Configure serial port and sub-interfaces
- Configuration for frame relay
- Speed of circuit (if there is an internal DSU card)
- DLCI numbers
- Frame-relay type
- Type of encapsulation
- Type of frame connection
- ISDN
- SPID Numbers
- Dialer Interface set up
- Authentication type
- Routing Protocol Setup
- Set up IP routes
- Set up Access list (if applicable)
- Logging Setup and Review
- Check that all manufacturerâs documentation is present
- Prepare support agreements
|